2009/08/31

Making up for lost time.

I’ve been running around Oregon for the past month or so, away from computers and cameras for the most part (shooting film.) The future is up in the air, as always. Here are a few recent frames.



2009/08/21

Annex Update

The house now has electricity and things are taking off. Subcontractors have already set most of the doors in upper two levels and have started work on stairwell railing. They are adding trim to the door frames. Music, previously impossible without power, can now be heard throughout the house.

Ben measures plywood for custom cabinets while two homeless people sleep outside.
An electrician connects wires to the house on Tuesday. The house now has power.
Adam removes carpet on Tuesday on the second-story stairs.

2009/08/13

Annex Update

I haven’t been to the house in nearly a week. Things seem to be picking up. The drywall work will be finished by the end of the day, and the house is supposed to have power on Monday. Ben is making cabinets for the rooms: today he measured and cut plywood sheets. Adam is coming in either tomorrow or Monday to help remove carpet on the stairwell and tile from the bathroom. I’ll be at the house on Monday when the power is turned on. Stay tuned.


A member of the drywall crew sands patches in the sleeping porch.
The carpet and tile man measures the kitchen floor.