I went to the Annex this morning to shoot for a bit. Electricians are installing heater units in each room. Ben, Adam, and Andrew are plugging away with the sheetrock in the rooms. I was tired from just waking up and bored, so I tried some different shots. Lately I’ve been reading the history of Magnum and looking at some inspiring work. Good stuff.
Adam places reinforcing boards on a thin wall before installing sheetrock.
Ben, Adam, and Andrew work on third floor rooms.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment